Friday, November 20, 2009

Basecamp Due Dates

We are already receiving pings on this one and, thanks to our crack engineering staff, have updated IntelliGantt and the IntelliGantt Add In for Microsoft Project. Now IntelliGantt will publish the Finish dates of your tasks as Due Dates within Basecamp.

The value here is whenever you need to reschedule a project, you have the full power of a rich scheduling engine to automatically adjust the dates and the rich integration of IntelliGantt to automatically all the due dates within Basecamp.

We will keep the 'old way' of adding due dates to ToDo Items so that it will be easy for people to back out of it. Just go to Settings->More Settings and turn off the Append/Prepend due dates selections.

Going forward, all tasks will have their Due Dates in Basecamp populated because that's what IntelliGantt does-- help you schedule (and share) tasks.

We will have a screencast showing the integration on Monday, but you can try out this new IntelliGantt feature today if you'd like.

Wednesday, September 23, 2009

IntelliGantt with Microsoft Project Trial Versions

A couple of folks wanted to evaluate the IntelliGantt Add In for MS Project recently and ran across an issue I would like to share. They had MS Project versions 2000 and 2003 respectively. Since the IntelliGantt Add In is built for MS Project 2007, they went to Microsoft and installed the MS Project 2007 trial version. After all, they wanted to see if everything worked before upgrading to MS Project 2007 and IntelliGantt.

However, in trial mode, there was odd behavior in that every time they attempted to 'Share' a project to their SharePoint site, MS Project thought it was in edit mode and therefore the 'Share' operation was not successful. Folks were able to export the project to SharePoint, but then were not able to 'Stay Connected' (which is basically how 'Share' works under the covers).

Being in the IT department, our intrepid IntelliGantt evaluators were able to activate their MS Project trial and then, lo and behold, the problem went away and full IntelliGantt sharing was available.

So, if you're testing IntelliGantt with a trial version of MS Project and are seeing this behavior, see if you can try IntelliGantt with a licensed version of MS Project during your evaluation.

Or you can just trust me :)

Tuesday, September 22, 2009

Mapping SharePoint Fields to Project

With IntelliGantt you've always been able to create new fields within your SharePoint task lists by using the powerful 'Workspace Settings' form to activate fields and determine which data goes to SharePoint, comes from SharePoint or both.

The latest incarnation of this form is below:



You may notice now there is a new column available, with a button above it no less. This new column, named 'Server Name' let's you attach IntelliGantt to existing SharePoint list columns. In effect, it let's you map your SharePoint fields to Project fields.

This is especially helpful when you've customized your lists to handle specific types of tasks and have built dependencies with other lists-- perhaps a data connection or two. It would also be great if IntelliGantt pulled in fields created by workflow activities so that a project manager could monitor workflow progress within their tool. (In fact you can, but I'll detail it in another post).

For more details on how exactly you can map a project field to a SharePoint field with IntelliGantt, check out our help page.

If you'd like to try it today, check out our 15-day fully functional evaluation.

Saturday, September 19, 2009

The Hidden Talents of our Dog

And now for something completely different...

We have a dog named 'Pudge' approaching 10 years of age. Sure, we've taught him a few tricks-- the basic 'Shake', a simple 'Roll Over' and a couple more. Turns out he had one more trick up his sleeve (yes, our dog thinks he's human so yes, he has sleeves). We would never have found it without the help of our two daughters playing with their blocks.

The kids were playing with 'animal sounds' blocks that, when joined correctly, make sounds-- a pig grunting, a cow mooing..... and a horse whinnying. Imagine our surprise when the kids were trying the sounds of the farmyard and we heard Pudge's contribution.



For whatever reason, it only works with the horse.

Wednesday, September 02, 2009

Basecamp Todos, Meet Your Due Dates

We've received a ton of feedback since we introduced Basecamp integration into our IntelliGantt products. For such a simple looking web application, Basecamp has an awful lot going on!

Which is a good thing and speaks well to how effective Basecamp's solution works as a communication tool.

Of course, scheduling is still a part of project management and that's where IntelliGantt comes in. We just posted a screencast that shows in detail how you can import a Basecamp project, apply schedules to the deliverables and, best of all, attach due dates back to the Basecamp Todo items. This means team members using their web browsers can see the most important piece of the project-- when their Todo item is due.

We did have to make a few assumptions. For example, when importing a Basecamp todo item, IntelliGantt creates a task. In order to create a task, we need at least a start date. Since Basecamp doesn't have one we use 'today'. Since rescheduling a project in IntelliGantt is as simple as dragging the project summary bar, it works.

Once in IntelliGantt, you can create task dependencies, regroup things in summary tasks and even define hourly rates for resources in order to see cost information.

To show start and finish dates we introduce a special 'Title Format' option that lets you prepend or append start or finish dates to Basecamp Todo Lists or Todo Items. That's a lot of 'ors', so this is a great segue to the screencast which shows you exactly how it works.

When you select a format like, 'prepend finish dates', your next update will adjust all Basecamp Todo items such that the due date will come before the Todo item's display name. This feature is locale aware so that US folks will see the dates formatted as Month/Day/Year while European folks will see Day/Month/Year.

There's a lot going on with this feature, but hopefully it will be simple and easy to use-- just like Basecamp.

Monday, August 17, 2009

Filtering SharePoint Members in your Project

SharePoint is quite flexible in how many ways users can become site members. So flexible, in fact, that you can add every person in the company to a root site and have every sub site inherit that member list.

Which is great, unless your company has 50,000 people in it.

We've listened to our customers at large organizations who are using IntelliGantt and the IntelliGantt Add In for MS Project to run projects within their departments, with external vendors but not across the entire company. The fruit of our efforts (and your suggestions) are two tools: 1) A resource pool that helps you be more selective with who is included and 2) a resource filter that helps you be more selective with who is excluded.

The Resource Pool



This feature allows you to pull SharePoint members from a specific site, organize them by groups and select individuals you will be working with often. You can add them to your currently selected project by clicking the checkbox by their name, or remove them from the project by unclicking the same checkbox. We even let you enter an hourly rate that will be used when they are assigned to tasks. This is a common scenario and we have a helpful page dedicated to walking you through exactly how it works.

The Resource Filter



This feature is designed to help you exclude people from your project. For example, if the SharePoint site you are working with has 50,000 users as members, I would strongly suggest unclicking the 'Add Members as Resources' checkbox so that everyone is not pulled into the project. Then, use the resource pool above to be more selective about whom to include.

Or, if your groups is more manageable but there are just a few folks (or system accounts) that don't need to be added to your project, you can define any combination of the three tests shown in the picture: 1) display names that start with a string you provide, 2) display names that end with a string you provide and 3) display names that contain a string you provide.

All three test cases are always run, but you can customize the tests per project. This means if you have a couple system accounts, like NT_AUTHORITY in the picture above, you can easily exclude them from the list. If you'd always like to exlude NT_AUTHORITY (and who wouldn't? :)), you can save the exclusion lists as the default setting for all newly created projects going forward.

Check out the help page for this feature as well.

Taken together, IntelliGantt will help you work with your resources as adroitly as it helps you share your tasks. And again, thanks to our customers for letting us know how important resource filtering is.

Thursday, August 13, 2009

A Bigger SharePoint Gantt Chart

[April 2011 Update - The Big Kahuna of SharePoint Gantt Charts]

A lot of customers have been asking about the Gantt chart native to SharePoint and how it could be customized. One of the recurring questions is how to make it bigger. For instance, the Gantt Chart and the Task List are split about 50/50 in the default SharePoint view. Wouldn't it be nice to expand the Gantt view to take up the entire real estate?

Marc Molenaar thought so too, and fortunately he had the time to do it. Check out his blog posting that shows how you can use JQuery to supersize the Gantt Chart.




Great Stuff.

Tuesday, August 11, 2009

Rain Makes Headlines in Seattle

From today's front page of the Seattle Times:



Really? Rain in Seattle? At this hour?

This must be a sign of something... a sign it's been a great summer!

Tuesday, July 07, 2009

Timeboxing a Task List

We just added a new feature to both IntelliGantt and the IntelliGantt Add In for Microsoft Project-- task list timeboxing. This was actually a customer request that we thought was a good idea. We worked with the customer for their requirements and this is what we came up with:



Well, not quite all of that. The new feature is located within our 'Workspace Settings' form that gives you many, many options. The Time Box feature is in the lower right:



Using these you can specify an 'After' date and a 'Before' date. This means all tasks after X and before Y will be published, synchronized or exported (depending on the operation you chose). This means if you have a long duration project spanning several months, you can provide a bit of focus to the immediate tasks during a defined time.

This will work in combination with the 'Filters' you can specify in the other tab. The logic is the filter will be ANDed to the TimeBox values.

The other new feature is SharePoint specific-- the ability to tell IntelliGantt which task list view to use.



More than a few customers have customized their views and rather than IntelliGantt using the default AllItems, would like IntelliGantt to use one of their smarter views. Now you can click on the 'More Settings' from the Workspace Settings and supply the view you want IntelliGantt to use.

Thanks all for your suggestions!

Monday, June 29, 2009

Bamboo Solutions PM Central Integration

We're keeping this here for posterity, but if you're looking for a great SharePoint Gantt Chart for visualizing and aggregating SharePoint tasks, we recommend the IntelliGantt Web Part. Bamboo Solutions recently invited us to kick the tires on their PM Central solution. Since IntelliGantt already integrates with their Task Master and Project Portfolio Dashboard, it seemed like a natural. Thankfully, the PM Central solution packages the Task Master and Dashboard into well planned and visually rich SharePoint templates geared toward the project manager and team.

The result is impressive-- a comprehensive view of all your projects with detailed project information in every site. The only thing missing was the ability to synchronize IntelliGantt and Microsoft Project plans. That's where we come in.

Using IntelliGantt or the IntelliGantt Add In for MS Project you can work with your current project plans in PM Central with your team. The project manager plans the schedule and scope, the team report their progress and give their feedback. Where PM Central really shines is with the summary rollups management is always interested in seeing.

We created a page giving you the detailed steps to get IntelliGantt up and going with PM Central and the Task Master. We think it can be done is less than 3 minutes the first time you try. The result will be a schedule the project manager owns, but a plan visible to the entire team.

Friday, June 26, 2009

A Few Hundred Pages of Documentation...

... makes for a quiet blog.

I'm currently helping a client migrate several terabytes worth of data into their SharePoint server. It's a fun problem as there's a Siebel CRM application that most of the business folks use, which of course needs to integrate with SharePoint. Naturally you'd think it'd be easy (heh heh). The issue was every document was being stored in Siebel as an attachment to entities and activities, which makes it really hard to do document management things such as versioning. They developed a system that sort of worked, but when a big government agency asks you about your document management strategy... well, then attachments don't look so good.

The document management and versioning answer turned out to be SharePoint, but the trick was how to match Siebel's relational view of the world with SharePoint's hiearchical (as in web addressing) view. It turned out the business organization had a natural encapsulation within Siebel that lended itself very well to a URLs hiearchical requirements. So we developed an addressing scheme the Siebel developers could generate from Siebel data, transform it into a URL using predefined rules and thereby point users to the right spot in SharePoint.

And did I mention a few hundred pages to document this all? Just adding to the terabytes!

Wednesday, June 03, 2009

IntelliGantt in the Show Me State

There's no such thing as bad press-- especially when it's really good.

I had the pleasure to read Jamie Scheppers post describing her experience with Basecamp, Microsoft Project and IntelliGantt. In addition to showing the superb level of education the University of Missouri provides, it also captures the exact user scenario IntelliGantt is designed for-- bringing systems together in order to bring people together.

We're happy to provide a solution that makes sense and look forward to working with Jamie and other Basecamp users to improve the experience, provide more features and make the integration that much better.

If you've got something to say, be sure to let us know!

Tuesday, May 19, 2009

What the Competition will do

I was just on the phone with a prospective customer today doing an IntelliGantt demonstration and accidentally learned something about the competition. She's currently using the free, fully-functional 15-day evaluation of IntelliGantt and trying it out for their team. She is also testing one of our competitors at the same time. As a result, after installing IntelliGantt the two products were visible on the menu bar-- side-by-side (cue spaghetti western music).

Until you restart MS Project.

So she asks me: 'Why did the IntelliGantt menu disappear?'

Hmmm... well, we haven't seen that one happening in-house in the test lab, so we go through the code, put in several checks and add additional logging. These changes go in to one of our automatic updates customers receive.

It turns out one of our competitors is removing IntelliGantt from the Project menu. During the online demo she confirms that if she removes the other add-in, the IntelliGantt menu reappears.

Good to know.

Why would the competition resort to such tactic? The reason is clear-- when compared side-by-side for value there is no comparison. IntelliGantt offers the most robust, feature-complete client side integration between Microsoft Project and SharePoint available today.

We don't charge your SharePoint users an access license. We don't require complex server installations. We don't try to upsell you to more expensive plans. Heck, we don't require anything of the server except that web services be enabled.

We just make it simple. Want to work with SharePoint out of the box? IntelliGantt is your best solution. Want to make use of the 'Fabulous Forty' templates from Microsoft? Again, it's IntelliGantt. Need a richer web-based Gantt Chart? IntelliGantt is happy to work with web part providers like Bamboo Solution's Task Master.

Integration with a Portfolio Dashboard? Check.
Client side resource pool? Check.
Client side multi-project dashboard? Check.
Robust baselining and actuals support? Check-a-Roonie!

Our job is to provide the best solution connecting your project desktop with online services. Looks like we've done so well that the competition wishes you'd never seen it.

Tuesday, May 05, 2009

Viewing Parent/Child and Task Dependencies in Task Master

IntelliGantt supports Bamboo Solutions nifty Task Master web part which lets you see parent/child relationships, task dependencies and milestones within SharePoint via your web browser. However, by default IntelliGantt uses the 'Tasks and Milestones' filter, which filters out summary tasks.

Because this creates a subset of all your tasks, IntelliGantt essentially 'flattens' the hiearchy-- because summary tasks are not shown there is no parent to set.

Similarly, if a filter is active, task dependencies are not shown because its either not clear or possibly even misleading to attempt a partial set of task dependencies.

Therefore, if you want to make use of all the Task Master features with IntelliGantt (both the desktop and the MS Project Add In) you will want to make sure the filter in the Workspace Settings is set to 'Show All Tasks'. By default it is 'Tasks and Milestones'.

Here's a screenshot of what you want to set:



To access this in IntelliGantt, select a project, right-click and choose 'Workspace Settings'.

To access this in the IntelliGantt Add In for MS Project, drop down the 'IntelliGantt' menu to the 'Project' menu flyout and choose 'Settings'.

Also, be sure to activate the 'Milestone' field so that milestone information is sent to the Task Master. This maps to any zero duration task in IntelliGantt. In the Add In, its any zero duration task or any task marked 'true' for the MS Project Milestone field.

Finally, if you consistently work with the Task Master, you may want to click the 'Save as Default' checkbox at the bottom of the Workspace Settings. This will save your current settings and apply them to all new IntelliGantt projects going forward-- like Task Filter.

Wednesday, April 29, 2009

TeamDirection Sets Up Basecamp

A brief note about a major new feature we've just put in-- integration with Basecamp.

Our philosophy has been, and continues to be-- provide the best tools on the desktop for the project manager to connect with his or her team.

The most productive tool for the project manager married with compelling and productive solutions for the team. We think it makes sense. See what you think of the screencasts. Or better yet, try it out for yourself. Both the IntelliGantt desktop and the IntelliGantt Add In for Microsoft Project have this feature as of today.

IntelliGantt Basecamp Introduction

IntelliGantt Basecamp Options

Microsoft Project Basecamp Introduction

Monday, April 27, 2009

Build 4.0.0.147 Released -- Task Master Support

We're keeping this here for posterity, but if you're looking for a great SharePoint Gantt Chart for visualizing and aggregating SharePoint tasks, we recommend the IntelliGantt Web Part.


Just a note that build 4.0.0.147 of IntelliGantt and the IntelliGantt Add In for Microsoft Project has been pushed to the web. This one has rich support for Bamboo Solutions Task Master web part. This improves the Gantt Chart experience in SharePoint with parent/child relationships, task dependencies, milestones and scaling.

You might also notice a new sharing option. Because we're still building the support pages it's still on the QT.

Friday, April 24, 2009

Now Supporting Bamboo's Task Master

We're keeping this here for posterity, but if you're looking for a great SharePoint Gantt Chart for visualizing and aggregating SharePoint tasks, we recommend the IntelliGantt Web Part.


We were hard at work building a great new connectivity feature into IntelliGantt when the phone started ringing.

'I need a better Gantt Chart within SharePoint.'

'How can I show parent child relationships in the SharePoint Gantt Chart?'

'Is there any way to show task dependencies in the SharePoint Gantt Chart?'

'What about scaling?' (I assume she meant 'in the SharePoint Gantt Chart' as well)

In fact, I think the single most popular post on this blog is this one-- all about creating a Gantt Chart view for your task list.

Point Taken! If only there was a good Gantt Chart for SharePoint.....

Turns out there is: the Task Master web part from Bamboo Solutions. In fact, last November we hooked up IntelliGantt and the IntelliGantt Add In for Microsoft Project to the Bamboo Project Portfolio Dashboard.

This April I'm pleased to say we just hooked up IntelliGantt (both flavors) to the Bamboo Task Master. Import, Export AND bi-directional synchronization supported. Resources with hourly rates, Costing and Work supported. Resource Pools, Templates, Multi-Project view all supporting excellent collaboration.

It's fresh out of the oven, but if you'd like to beta test it then send support [at] teamdirection [dot] com a note and you can try it today. The beta period shouldn't be long-- a week or so-- as the Task Master is built upon the standard SharePoint Task List which IntelliGantt has been working with for years. We just had to get the new fields Bamboo added situated-- Parent Task and Predecessor Task.

Here's a picture of the Task Master above and the IntelliGantt desktop below.




Now back to the really cool connectivity feature to surprise you with next week :)

Tuesday, April 21, 2009

Forms Based SharePoint Login

A few people have been asking about this as they're working with IntelliGantt. SharePoint has a feature whereby you can 'disable' NTLM login and instead present a web form authentication challenge. Up to now IntelliGantt would alway use NTLM by default. However, with build 4.0.0.146 (which we just posted), IntelliGantt provides the ability to force a login when first connecting with a SharePoint site.

The built-in Windows Login form will still appear, but the value IntelliGantt will use will duplicate the same username/password values in the form authentication.

By default this 'Require Initial Login' is turned off. You turn it on by opening the 'SharePoint Settings' form. In the desktop this is found under the 'Settings' menu. In the Add In, it's also found under IntelliGantt->Settings. Because there are just a few way to customize SharePoint my hunch is you'll see more SharePoint Settings options in the future.

Here is the screen with the checkbox at the bottom. In case you're wondering what all the 'priority' and 'status' strings are for, this is how International users can customize the priority and status fields IntelliGantt uses when updating task values in SharePoint in your preferred language.

Friday, April 10, 2009

Modifying Content Types With Additional List Fields

One of IntelliGantt's most powerful features is it's 'Workspace Settings', which allows the project manager to add fields to a task list, dynamically update read/write privileges, change their display name and description. When working with some templates, however, you may be flummoxed when you see your fields in the overall view (like Actual Duration and Duration):



But when you go to edit a task, the custom fields are not there:



In fact, it feels like it should just work when you go to the task list's List Settings administration page and see the custom fields there:



The unknown key to this conundrum is that the list is actually using a content type to define its fields. This specific list is from the the 'Change Request' template from the Microsoft 'Fabulous Forty' pack. Other templates from the 'Fabulous Forty' also use content types to define the fields for their Project Tasks, Project Milestones and other lists. In fact, content types are very powerful in that they encourage re-use. The problem here is more with the UI as the fact that a content type is in use is totally hidden.

To add your custom fields to the content type this list is using, first click on Advanced Settings, located in the General Settings group near the top. Clicking on Advanced Settings let's you see this very important setting:



In order to add fields to our content type we will need to manage the content type, so click 'Yes' for this setting. Now when we return to the List Settings page, notice a slight change (helpfully outlined in burgandy):



There's that content type! This Project Tasks list is using a 'Project Task' content type to define the fields. Click on the 'Project Task' entry which takes us to this page where we can refine it:



Select the custom fields you wish to add to the Project Task content type (all of them in this case):



The end result is that now these custom fields will be available when you edit a task:



This isn't specific to task list, but is a general solution for how SharePoint binds lists with content types. The key is the enabling content type management in the Advanced Settings.

Thanks to Jack Hill from Oxbo International for working with us to solve this puzzle.

Sunday, April 05, 2009

Marking Fields with New or Unread Data

Up to now in IntelliGantt we've been marking entire rows as unread. Which is good, but considering an IntelliGantt row can have more than 100 custom fields, we thought we could do better. For instance, it might be useful to show which fields changed after a synchronization. It turns out the difference logic we use can do a field-by-field comparison, which means we can do something like this:



You can see the top two rows have unread markers on the left. More subtle is the dark gray circle in the top left of the task display name in row 2. This is the 'unread field' marker. We originally started with a similar 'unread task' marker in the cell, but it turns in to be a lot of yellow and is so vibrant its quite distracting.

The gray circle is not as visually intrusive so you won't lose track of the task data. There's also some interesting things we can do with this as well, such as changing its color when the mouse is over it. We're even thinking of making it behave like a button.

What will it do? Hmm... We have an idea for that.

Friday, April 03, 2009

Work, Estimated Work, Actual Work, Remaining Work and Work Variance All At Once

Here's a bit more detail on how you can track Work, Estimated Work, Actual Work, Remaining Work and Work Variance using either IntelliGantt or the IntelliGantt Add In for Microsoft Project with WSS 3.0/MOSS 2007.

First of all, you want to make sure your 'Workspace Settings' activate the work fields you need. For this example we will use all the Work Group and the Work Remaining fields, so we mark them as 'Members Read' and 'Members Write' like so:



You won't be able to set the 'Members Write' checkbox for Work Variance because this is a read only field. That is, the value is always computed.

When you share a project to SharePoint with these workspace settings, you'll have the work fields you enabled available for you to edit, like so:



In IntelliGantt or Microsoft Project, when you update 'Work' fields, you will see the ramifications to your updates immediately with schedule changes, percent complete changes or work percent complete changes. This makes it easy to also undo a change. With SharePoint, we get all the data at once and its up to IntelliGantt to make sense of it.

So how does it handle changes to Work, Estimated Work, Actual Work and Remaining Work at once? IntelliGantt enforces an implied order to your changes. That is, IntelliGantt will order the datastream coming back from SharePoint and evaluate the 'Work' fields in the following order:

1) Work
2) Estimated Work
3) Actual Work
4) Remaining Work

Because IntelliGantt has its own scheduling model, it can apply changes that affect the schedule as it works down the list. For example, let's say I only update the Work field. We see in the above example it is 16 hours. What if I make it 24 hours?



I click 'Update' in IntelliGantt and it communicates with SharePoint, performs its calculations and changes the list to...



Wait a second, what happened? The answer is that first it applied the change to Work, which increased from 16 hours to 24 hours. This resulted in the project model being updated. Estimated Work and Actual Work were unaffected by this change. Remaining Work, however, was affected. In the IntelliGantt model the Remaining Work value jumped from 6 hours to 14 hours; an increase of 8 hours-- the same 8 hours we increased Work by.

However, the value in the SharePoint field Remaining Work was still 6. It had not changed. So, as IntelliGantt worked through the order of 'work field' updates, it computed the difference between the IntelliGantt models Remaining Work and SharePoint's incoming data value for Remaining Work. That value? Negative 8 hours, which cancelled the 8 hours we just added. The model worked perfectly! :)

For those non-model types (myself included in this category), we can do a couple things to change behavior so that our Work update 'sticks'.

1) We can turn off the 'Members Write' flag for the Remaining Work field. If this flag is off, IntelliGantt will not receive the Remaining Work value, the difference won't be computed and therefore the model won't add the opposite of the Work value we put in.

2) We can update what we want the new Remaining Work value to be. If we add 8 hours to Work, then we can add 8 hours to Remaining Work. When IntelliGantt adds the new Work value, it will add 8 hours to Work and to Remaining Work in its model. As IntelliGantt works through its order of updates, when it gets to Remaining Work, it will compare the incoming SharePoint value with the value in its model-- and it will match. So no update will happen. Which means Work will be 24 hours and Remaining Work will be 14 hours.

Would you believe there's actually a third way to update Work without updating two fields or performing any match? Remember that these work fields are processed in the order defined above: starting with Work and finishing with Remaining Work. We can take advantage of this and only update Remaining Work like so:



When IntelliGantt processes the incoming data, it will evaluate the work fields as follows:

1) Work -- No Change
2) Estimated Work -- No Change
3) Actual Work -- No Change
4) Remaining Work -- 8 hour change therefore add 8 hours to Work

Of course, we don't want to always add to our work load. We also want to get things done. This is best done by changing Actual Work to reflect how much work you've done and then by changing Remaining Work to reflect how much work you believe is remaining. For example, with our original values:



Let's say I've actually worked (yes, hard to believe) an additional 2 hours but believe there's still 5 hours remaining. In this case, I would add 2 hours to the existing 10 hours in Actual Work and subtract a single hour from Remaining Work.



When IntelliGantt performs a synchronization, it will do the following:

1) Work -- No Change
2) Estimated Work -- No Change
3) Actual Work -- Add 2 hours and, by implication, subtract 2 hours from Remaining Work
4) Remaining Work -- Add 1 hour and, by implication, add 1 hour to Work

The end result will look like this:



Granted, it is easier to simply modify the percent complete field and call it good. But if you'd like to be more rigorous than percent complete updates and want to start tracking hours, simple math with Actual Work and Remaining Work can lead to powerful results.

Wednesday, March 25, 2009

Working with SharePoint Members as Project Resources

We get this question quite a bit so we've posted a 'Best Practices' page explaining how both IntelliGantt and the IntelliGantt Add In for Microsoft Project work with SharePoint members. They also work with Outlook contacts and resources you add manually, but the SharePoint case is the most interesting.

The two use cases this page covers:

1) Building a simple resource pool from a SharePoint site
2) Turning resources that are really roles into actual SharePoint members (and yet they're still project members-- it's magic!)

Well, not quite magic. Basically, it all comes down to the email address. In MS Project, resources support an Email Address field. This is not in the default view so you have to insert the field into the 'Resource Sheet' view. If the Email Address field for an MS Project resource matches the Work Email field of a SharePoint member, they're connected! That's the manual approach.

Because connecting resources to SharePoint members requires this bit of housekeeping, there's really a third reason for the 'Best Practices' page-- how to add 'SharePoint Approved' members as resources to your project. With the IntelliGantt People pool, once they've been retrieved from SharePoint its as simple as clicking a checkbox.

Hopefully the 'Best Practice' page is more than a good read-- we want it to be helpful too!

Tuesday, March 24, 2009

IntelliGantt API Update

Just posted a simple 'Getting Started' document that explains the general concepts behind the IntelliGantt API and supports the accompanying sample application. Our goal is to make it very easy for system integrators to connect MS Project and WSS 3.0/MOSS 2007. For example, a hosting provider can easily add a feature that takes an MPP file and fleshes out a task list.

With this API, you will want to install IntelliGantt V4 on the same machine as the sample application. The sample application's reference paths assume you install IntelliGantt V4 into the default C:\Program Files directory.

Since you can now install IntelliGantt V4 on 64-bit machines as well, you may find the sample app doesn't find the references. This is because Windows 64-bit will append Program Files with a (x86). So you will want to update references in this case from:

C:\Program Files\TeamDirection\...

to

C:\Program Files (x86)\TeamDirection\...

You can get the API and documentation from our forum here.

Friday, March 20, 2009

Supporting Actual Work and Remaining Work on SharePoint

We enhanced both the IntelliGantt rich internet application and the IntelliGantt Add In for Microsoft Project recently to better support updating Actual Work and Remaining Work via WSS 3.0 and MOSS 2007. With IntelliGantt RIA it was a snap as our model has proven to be very accurate, especially how we handle Estimates and Actuals.

So we thought it would naturally fall out for the IntelliGantt Add In for Microsoft Project since they both share the same code base. But what we discovered was this:



Notice that each task has a duration of 2 days and a work of 24 hours. We started with with three tasks of 2 days duration and 2 days work. With Task I we set Actual Work to 8 hours and Remaining Work to 16 hours. This increased the Work field to 24 hours and gave us new % Work Complete, % Complete and Actual Duration values. With Task II we set Actual Work to 8 hours and Remaining Work to 16 hours. This increased the Work field to 24 hours and gave us a similar % Work Complete value. However, you'll notice quite a few differences between Task I and Task II: the same action gave us different % Complete and Actual Duration values.

This makes it really difficult to build a model for.

Finally, for Task III we did the exact same steps as above, but then typed in the same % Complete value (56%). MS Project took that value and slightly changed Actual Work, % Work Complete, Remaining Work and Actual Duration.

After studying the issue for a while, and working with our customers, we determined that the % Complete field is the key. Because this field can be arbitrary when updating Actual Work and Work Remaining fields, the solution is to NOT update the % Complete field and just let MS Project do its thing. IntelliGantt can then update and maintain the Actual Work and Work Remaining fields correctly-- and MS Project will maintain them correctly as well.

Everybody wins!

This investigation had an additional benefit in that it spurred us to create a form that a) let's you configure for this option and b) change the default behavior for automatically updating estimates and actuals.

Before, because we've been worried about automatically updating actuals and thereby automatically updating your project schedule, we had people 'Apply Actuals' so there wouldn't be any surprises. With the new usage model, project managers can tell IntelliGantt it's OK to update actuals immediately. Again, this makes it easier to use the Actual Work/Remaining Work update method. IntelliGantt is smart enough so that only the 'Actual Fields' you enable via IntelliGantt->Project->Settings will be applied.

Finally, you'll notice that you can set which Baseline you'd like to use for the current Estimates values. This makes it easy to create multiple baselines but still have an 'active' one that SharePoint members can view.

With build 4.0.0.139 the menu addition under IntelliGantt->Project, as shown below:



We have a help page explaining estimates and actuals options in greater detail. Better yet, you can try either our Rich Desktop or Wicked Smart Add In and see what you think.

Friday, March 06, 2009

Tasks go Here, Milestones go There

A customer asked me about an interesting scenario recently that I thought I'd share. As you know we've been focusing on the more project-centric templates from the 'Fabulous Forty' produced by Microsoft, but we haven't shown how you can roll up tasks and milestones and send subsets of information to specific lists in these templates. In this particular case, IntelliGantt shared tasks and milestones with full 2-way synchronization to the Project Tasks, but they also wanted to send milestones to the Project Milestones list that was also present in the site. The Project Milestones list was an easy way for stakeholders to quickly see a 'big picture' based on milestones being completed or not.

We thought this might happen, so we engineered IntelliGantt such that in addition to sharing individual projects, it could also 'export' groups of projects to lists of your choosing. For example, say we have two projects that have been shared to a Project Tasks list like so:



The Project Tasks list contain tasks and milestones and are handily grouped by their projects. While this example is trivial, imagine 500 tasks and 5 milestones. In this case it because more difficult to spot the major events designated by milestones-- they may be below the viewing fold or on another page altogether.

What would be nice is if we could roll up the two projects, filter out milestones and send them to the Project Milestones list.




Happily we can do just that by using IntelliGantt's dashboard and filters. The Dashboard option is right under the IntelliGant menu in MS Project (the IntelliGantt rich client has multiple ways to export rollups; this example is mainly for MS Project).



The dashboard is populated by clicking the checkboxes next to the projects on the left hand side. Every project you have shared will be listed there. You may want to check everything, or just a set of projects you want to work with. Because we only have two projects shared, we will select them both.



Once we have the projects we want, its time to send the items on their way. Click on the 'Export' button to start this process.



This brings up the 'Export Wizard', which is based on the 'Share Wizard'. Just as you would share a project, first you supply the SharePoint site URL and click 'Go'. The list of available web parts supporting tasks and milestones appears. This time we will select the Project Milestones list.



Finally, we just want to export the milestones from our two projects. To do so we will invoke the 'Workspace Settings', drop down the 'Filters' and select 'Milestones Only'.



Click 'OK' and then 'Next' back in the Export Wizard and IntelliGantt will send your milestones the the Project Milestones list you selected.



Now it is important to note this is different than sharing. You won't be able to synchronize these milestones. For this particular example, subsequent exports will use the 'Clear Task List' option so that only the most recent milestones populate the list.

However, as a means to quickly send important data to one spot where people know to look is very useful. IntelliGantt makes it easy to roll up projects, apply filters and send the result to the spots you need.

Tuesday, March 03, 2009

IT Team Workspace Integration

Continuing our philosophy of being the data conduit from your desktop to all those rich internet solutions, we've verified that IntelliGantt works well with the IT Team Workspace template for WSS 3.0. Again, its one of the 'Fabulous Forty' that Microsoft produced and follows the same design pattern of a Projects List to contain project summary and a Project Tasks to contain tasks. The Project Tasks has a Lookup ID that binds a task to a project, which IntelliGantt is happy to do for you so you don't have to for each task in your 1000 line project.

I suspect we will be verifying a few more rich SharePoint templates that follow the Projects List and Project Tasks pattern. Another template we've been thinking about is Timecard Management, which makes a lot of sense as a means to show off the new Timesheet feature in IntelliGantt.

In truth, though, we are 100% customer driven with which SharePoint templates we integrate with. In fact, if you're using a template from another vendor or one developed in house, we'd be happy to hook it up to MS Project or to our IntelliGantt desktop and leverage your investment.

We have a 'Best Practices' page up for the IT Team Workspace. On to the next template!

Tuesday, February 10, 2009

Sometimes the Solution is too Simple

Being a client application that communicates via web services with SharePoint, there's always been one sticking point-- the transition from the client app to SharePoint. That is to say, you have IntelliGantt or Microsoft Project with your project data in one window and SharePoint with your team view in another window. Mouse clicks, Alt+Tab or tiling-- sure there are band-aids. But context swtching is usually the bane of good software and its irked me for a while now.

So a brief context switch... My wife was out of town recently, so I had the two bambinas for a few days all to myself. Obviously, this meant no time in front of the computer. We had great time going to the children's museum, the zoo, the park... lots of kids stuff. After a few days of running around the house, it was time to clean it (especially before the wife returned). After I had cooked breakfast and did the dishes, wiped the counters and changed a diaper, I started vacuuming.

And then it hit me.

You know, IntelliGantt has a Grid/Gantt view and a Dashboard view, why not embed a web browser as another view so you can see your SharePoint tasks in context. Kind of like this:



This is great for a few reasons:

1) It houses IntelliGantt and SharePoint tasks in the same context.
2) It seeds the site URL values when I want to share, export or import.
3) The SharePoint view changes as I select shared projects in IntelliGantt.
4 It captures the powerful 'Dual View' of what the project manager can see and what SharePoint team members see.
5) IntelliGantt changes as I select shared tasks within IntelliGantt!

We've captured the basics in a screencast, but I wanted to expound a bit more on it because, practically, I'm quite pleased with the results. Typically, when I demonstrate IntelliGantt, there's an awkward 'and now I'm changing hats and viewing the project through a web browser' segue. And when I return to IntelliGantt, the reverse seque. And back. And forth.

Now, we can all stay in the same application. Because it embeds the IE web browser, it handles SharePoint the exact same as IE-- adroitly navigating authentication challenges and single sign on issues. Better yet, because the browser is running in the IntelliGantt process space, you don't have to login twice.

What is most powerful, however, is point #4 above-- exploiting a huge advantage that Software + Services provides. The advantage is a rich application with appropriate tools designed for project manipulation combined with a robust collaboration platform with authentication and data views designed for project communication.

A team member doesn't need a powerful scheduling engine in order to see when one of her tasks is due. Similarly, a project manager needs more than a web interface when updating thousands of task start and due dates. Or, more bluntly, would you rather update 1000 tasks in SharePoint by clicking 1000 task edit links, updating at least a start and end date for each, clicking 'OK' and hoping the changes are correct? Or, would you rather open IntelliGantt, click and hold the mouse on the project bar and drag it forward a couple days? One might take 2 hours and is prone to error and the other would take about 5 seconds.

The right tool for the right job... and now all in one context.

I should play with the kids more often!

Tuesday, February 03, 2009

Working with the Budgeting and Tracking Multiple Projects template

Last week at SPTechCon I did a session on SharePoint project management using WSS and out-of-the-box lists, webparts and templates. The session received a good response because many people are unaware just how much is available with WSS, especially with the 'Fabulous Forty' templates Microsoft produced. And because its WSS, its all free.

Aside from the 'kid in the candy store' aspect of so much functionality a mere download and install away, its worth taking a look of several of the templates and seeing how useful they are for managing projects-- even multiple projects. For example, the template we spent the most time on is called Budgeting and Tracking Multiple Projects. Not only does it have a task list, but also a project list and even a dashboard to aid in monitoring project health!

As a result of the feedback, we created the first of several web pages on the TeamDirection site highlighting both the functionality and how IntelliGantt integrates with it. This particular template is greatly enhanced when paired with IntelliGantt.

For example, to really exploit the value of the Budgeting and Tracking Multiple Projects template you need to create multiple projects each with multiple tasks and link projects to tasks by updating each tasks lookup ids. Not only is that a run-on sentence, but it takes roughly thirty seconds to do per task. If you have a project of 1000 tasks, that time adds up very quickly.

However, with IntelliGantt you can make all the associations in under 30 seconds total! You project manager (or intern changed with updating all those tasks) will thank you.

The rich integration is provided by both IntelliGantt and the IntelliGantt Add In for Microsoft Project. If you already have MS Project 2007 in-house, we encourage you to check out our Add In. If you don't have MS Project or are looking for 'Project Lite', check out our rich client. Either way, we're happy to help you get the most from SharePoint.

Tuesday, January 27, 2009

If Anyone is at SharePoint Technology Conference Wednesday or Thursday

SPTechCon is running from January 27 - January 29th. Somehow it still snuck up on me.

I am speaking at two sessions. The first session (407, January 28 at 2:45) is a deep dive in to SharePoint web services and how desktop applications, rich internet applications or even Silverlight and Flex can connect and update data. I'm pinging our hosted WSS server right now and retrieving lots of fun XML to go over!

The other session (805, January 29 at 1:30) covers out of the box project management. I'll be highlighting the project management goodness that comes with SharePoint: task list, project task list and dashboards. I'll also be using the latest 64-bit build of the IntelliGantt BETA. Gave me a good excuse to get a new laptop-- needed a test machine!

Tuesday, January 20, 2009

Publishing Multiple Projects to One SharePoint Task List

We just got a question from an IntelliGantt evaluator that calls to our attention a really great feature that we didn't expose very well. That is, the ability to publish multiple projects (and their tasks, of course) to a single SharePoint list. Customers had asked for this with the previous version of IntelliGantt (the Plus version) and therefore we added Multiple Project Export to version 4.

First, check all the projects you would like to be active by clicking the checkboxes in the 'Projects' view on the left. Then on the right, in our Grid/Gantt control, click the 'Export' button (highlighted in red). This will bring up the export wizard and will allow you to send this group of tasks as a whole to a single task list.



You also might want to use Workspace Settings and apply additional filters to what will probably be a large group of tasks. For example, you can apply the 'Milestones Only' filter so that only milestones from all the projects are sent to SharePoint. Other interesting filters are 'This weeks tasks', 'Next weeks tasks' and 'Summary tasks only.'

Even more filters are available, but you get the idea. IntelliGantt helps you round up groups of projects and send the important information to SharePoint.

IntelliGantt API Example

Several of our clients have been very interested in using IntelliGantt APIs to customize the integration between Microsoft Project and SharePoint. We're happy to oblige and have just posted a Visual Studio 2008 C# solution that shows how you can:

1) Share projects to SharePoint, Local and Cloud workgroups
2) Update projects on SharePoint, Local and Cloud workgroups
3) Unshare projects from SharePoint, Local and Cloud workgroups
4) Create SharePoint task lists based on template IDs
5) Modify Workspace Settings, which in turn modifies the SharePoint task list when updating
6) Import project plans from MS Project
7) Read (ie. update) changes from MS Project to IntelliGantt
8) Export projects to MS Project
9) Write (ie. update) changes from IntelliGantt to MS Project

We opened up a new forum section to introduce and support the API as we start getting feedback-- and ideas!

The other part of this effort was creating a traditional MSI package to install IntelliGantt. This makes it easier for the example to reference IntelliGantt dlls since the ClickOnce installation generates human unfriendly paths and names, whereas the MSI puts assemblies in Program Files\TeamDirection\IntelliGantt.

(As a bonus, this also addresses deployment to Citrix environments, like Xen. Now the IntelliGantt executable can be explicitly identified and shared as a published resource.)

For the purposes of this API example, you'll want to install the MSI package first, and then unzip the C# solution.

The example doesn't show much in the way of actually working with a Project schedule. What it does show is just how amazing the SharePoint web services API is. Keep in mind that this is a client only install-- nothing is needed for the SharePoint server. (You can run this example against a hosted SharePoint server if you'd like). And yet you can do just about anything needed to move data back and forth. This means the door is wide open for integrating your project data with SharePoint services. We've tried to make the API as accessible as possible-- as easy and intuitive as the UI is-- but look forward to your feedback to see how well we've succeeded.

If you're curious about IntelliGantt's scheduling engine, you can do an Object Browse on the TDINETProjectModel assembly and see all it exposes. Most of the public names will make some sense. For our next API example, we will create a solution that highlights IntelliGantt's robust and feature rich scheduling engine, as well as templates, resources, assignments, filters, hyperlinks and task dependencies.

Finally, check out some of those enumerations to get an idea of what just might be coming down the road!

Thursday, January 15, 2009

Viewing SharePoint Tasks in a Calendar

[April 2011 Update - Integrating SharePoint Task and Calendar Lists]

In the last week or two I've started fielding more and more questions about viewing tasks in a calendar. It's usually along the lines of 'Do you guys have a calendar web part for tasks?'. To which I answer, 'you already have one in SharePoint'.

I don't see many quizzical response, most likely because these conversations are taking place over phone, but the quizzy vibes come through loud and clear. So I thought a little step-by-step primar illustrating how you can enable a calendar view in a standard, ordinary, run-of-the-mill task list would be helpful.

First of all, a SharePoint Task List is made up of three things: 1) a list, 2) task-specific fields (like Start Date and Due Date) and 3) multiple views. By default, you always have a 'raw data' view of all the fields, which, while utilitarian, isn't visually compelling.

The most popular view for a Task List is the Gantt View. But, as these past weeks have made abundantly clear, not far behind is a Calendar View. Thankfully, SharePoint task lists support multiple views, and a calendar is one of them. It is a bit different than the calendar web part, but still very effective for viewing your tasks across months, weeks and days.

On to the steps. Here is a task list being shown in a pretty Gantt view.



To see the Calendar view, we must drop down the 'View' button on the top right of the web part and create it. The menu pick is even called 'Create View'. (These images are kind of small on the page, but you can click on them to see more detail)



Clicking on 'Create View' takes us to this page, where we can choose the view we'd like. With every service pack, and especially with every major release, its a good idea to check out this page and see if any new goodies.... er... views are available.




Clicking on the 'Calendar View' takes us to the next page which lets us name and configure it. First we'll think long and hard and give it an original name like 'Calendar View'. You see a few options as well. Whether you you want to make this public and even the default view is influenced by how you want to configure it, as we will see shortly. For now, we'll move to the next batch of options.



Most commonly you'll simply choose the start and due date fields of your tasks for your Time Interval options. But, if you use a product like IntelliGantt, which allows you to modify the SharePoint task list to contain Actual Start and Actual Finish, then this is how you could create an 'Actuals' calendar. That will be an excercise left to the reader as I'll choose the standard start and due dates.



Calendar Columns is the next useful group. If you're asking 'why so many options?' for this group, its because you're defining a view within a view. That is, a calendar view can toggle among a month layout, a week layout or a day layout. First I'll define the titles for these three 'mini-views'.



To be honest, I'm not sure how the sub headings are displayed. But I chose 'Status' anyway.




Finally, we can click OK and see the calendar. But before we do, take note of the Filter options. There are two powerful settings you can use to make the calendar view a bit more dynamic: [Me] and [Today]. Me resolves to the current user logged in to SharePoint and Today resolves to the days date. The following two screenshots show how they can be used.




This will be another exercise left to the reader as our Filter options will look like this:



So where's this magical calendar view we've been working on? Click 'OK' and...

The Month view




The Week view




The Day view




We're done. We've created a Calendar view of our Task List for everyone to use. However, one problem remains: how do I get all my tasks in to this Calendar? Do I have to add them one by one by hand?

That's where we come in. My company makes IntelliGantt and the IntelliGantt Add In for Microsoft Project. We make it so easy that its actually fewer steps to add all your tasks than it is to create this calendar view.

If you'd like to see them in action, we have IntelliGantt screencasts and Add In screencasts. Better yet, though, if you'd like to exercise IntelliGantt software yourself, we have 15-day fully functional free trial.